8D Space made Hangzhou Bay approach bridge maintenance animation for Wuhan Erhang Road & Bridge Special Engineering Co., Ltd.
Recently, our company completed the "Hangzhou Bay Approach Bridge Maintenance Construction Animation" project for Wuhan Erhang Road & Bridge Special Engineering Co., Ltd.
The Hangzhou Bay Cross-sea Railway Bridge, a key control project of the Tongsu-Jiayong High-Speed Railway, is of obvious importance. It spans 29.2 km, including three navigation bridges (north, middle, south), and approach bridges across dikes, sea areas and shoals, with a 350 km/h double-track ballastless track design. The sea approach bridge totals 10.72 km, among which the south sea section, between Piers 162-251, stretches 6.96 km, using steel pipe piles and bored piles.
The released animation vividly and intuitively details all links of the approach bridge maintenance via vivid visuals.
Contact number:+8615902788822
Email number:512375387@qq.com
Company Website:www.crystal4d.com
Address: 18/F, Block B, Asian Trade Plaza, No. 628, Wuluo Road, Wuchang District, Wuhan